Site Steam Upgrade Project - Principal Contractor & Installation Package
Buyer: THE PIRBRIGHT INSTITUTE
- Published
- 17 October 2025
- Submission deadline
- 21 November 2025
- Estimated value
- £320,000
- Procedure
- Open procedure
- Lots
- 1
- Documents
- 2
- Notice number
- 066245-2025
- Reference
- ocds-h6vhtk-05cead
- Official source
- Official source
CPV codes
- 42160000Boiler installations
- 42162000Steam-generating boilers
- 42165000Steam condensers
- 44163140Steam and water pipes
- 45251230Steam-generation plant construction work
- 45331110Boiler installation work
- 51130000Installation services of steam generators, turbines, compressors and burners
- 71320000Engineering design services
Description
The purpose of this project is to increase the Institute’s sustainability (both environmental & financial), reduce carbon emissions and safeguard the steam supply to all buildings utilising steam generated at Pirbright. This will be achieved by a combination of the following three factors: • New steam main & condensate recovery system to steam users currently served by the end of life Western Boiler House. • Removal of inefficient and end of life Western Boiler house & increasing load on the currently underutilised, efficient, EC1 steam generation plant by 450kWh (585 kg/hr). • Upgrading 2 of 4 EC1 steam boilers with burners capable of 10:1 turndown ratio to enable more efficient operation at low production rates during summer months. Contract Scope The contract is for a single supplier to act as the Principal Contractor and complete all works as follows: • Supporting the Stage 4 design with client nominated designer and Project Manager • Supply and Installation of EC1 steam boiler burners (x2). • Steam connection & packaged steam – LTHW interface to Engineering workshop • Enabling works for new steam & condensate return connections located on EC1 steam distribution and WBH. • S…
Official publications
- FTS · 066245-2025 · 17 October 2025
Other tenders from THE PIRBRIGHT INSTITUTE
- Site Autoclave Service and Validation
- Site Energy Project Development Services
- ISO11 Fumigation Lobby Replacement Project - Civil Works and CDM Principal Designer/Principal Contractor Role
- Tx8 & Tx9 Transformer and Switchgear New Building - Retender
- ISO11 Fumigation Lobby and Dedicated Air Handling Unit (AHU)
- Provision of Planned Preventative Maintenance for the Chillers, AC Systems and Refrigeration
- Installation of Temporary Centralised Battery System (CBS) for emergency lighting in Brooksby Building following fire
- Brooksby Secondary Monitoring System (SMS) 3 Year Service Contract
- Supply and fit Plowright East Wing Emergency lighting batteries and removal and dispose of 80 defective batteries.
- Site Steam Upgrade Project - Principal Contractor Design & Installation Package
Frequently asked questions
- What is the deadline to bid for this tender?
- The submission deadline is 21 November 2025. Check the official source, as dates can be modified.
- What is the estimated value of this tender?
- The estimated value published by the buyer is £320,000.
- Who is the buyer of this tender?
- The contracting authority is THE PIRBRIGHT INSTITUTE (United Kingdom).
- How can I bid for public tenders in the United Kingdom?
- Bids are submitted through the official public procurement portal in the United Kingdom. El Vínculo helps you find tenders and analyse their documents; submission always happens at the official source.
Create a free account and receive new public tenders published in the United Kingdom that match your business, every day.