Preliminary Market Consultation for a 30 MW battery energy storage system (BESS) in Iceland
Buyer: Landsvirkjun
- Published
- 9 June 2026
- Lots
- 1
- Notice number
- 00394547-2026
- Official source
- Official source
CPV codes
- 42131000Grifos, llaves y válvulas
- 42112100Turbinas de vapor de agua
- 42113100Partes de turbinas de vapor de agua
- 42131140Válvulas reductoras de presión, de control, de registro o seguridad
- 42131142Válvulas de control
- 42131144Válvulas de regulación
- 42131240Válvulas de asiento
- 42131250Válvulas de aguja
Description
Landsvirkjun would like to invite you to take part in our Preliminary Market Consultation for steam control valves that will be located in the T/G Unit valve room and form the HP separator pressure control and bypass arrangement, as indicated on P&ID drawing THT-P-LBK-T0-0515. Their primary function is to reduce the pressure of high-pressure steam that is not routed through the T/G Unit, from 27 bara to 9.3 bara, before the steam enters the existing medium-pressure system. The HP steam separator is designed for a maximum steam flow of 176 kg/s, which represents the maximum steam flow expected to be handled through the steam control valves. The T/G Unit is designed for flexible operation and variable load conditions, where the steam flow through the turbine may change depending on available steam, operating mode, start-up, shutdown, load changes and maintenance requirements. The steam control valves shall therefore be suitable for operation across a wide flow range and shall be capable of supporting stable pressure reduction from the HP steam system to the MP steam system during both partial bypass and full bypass operation. Special attention shall be given to the risk of H₂S-induce…
Frequently asked questions
- Who is the buyer of this tender?
- The contracting authority is Landsvirkjun (European Union).
Create a free account and receive new tenders from European Union matching your business, every day.