Delivery of Vacuum pumps & measurement tools
Buyer: SCK CEN
- Published
- 13 June 2025
- Submission deadline
- 18 July 2025, 12:00
- Place of performance
- BE213
- Procedure
- Open procedure
- Documents
- 1
- Notice number
- 00383954-2025
- Reference
- 66939f4b-f24b-4a6e-8961-fb12c9e43602
- Official source
- Official source
CPV codes
- 31643100Aceleradores lineales
- 42122450Bombas de vacío
Description
Delivery of vacuum pumps and measurement tools according to the technical specifications. This assignment is divided into 4 lots: • Lot 1: Roughing pumps, remote drive units and connection cables • Lot 2: Turbomolecular pumps, controllers and connection cables • Lot 3: Ion pumps, controllers and connection cables • Lot 4: RV gauges, HV-UHV gauges, controllers and connection cables
Lots (4)
| Lot | Description | CPV code | Amount |
|---|---|---|---|
| 1 | 2023-156-RB - 1 | 31643100 Aceleradores lineales | — |
| 2 | 2023-156-RB - 2 | 31643100 Aceleradores lineales | — |
| 3 | 2023-156-RB - 3 | 31643100 Aceleradores lineales | — |
| 4 | 2023-156-RB - 4 | 31643100 Aceleradores lineales | — |
Award criteria
- Price — zie tenderdocument § 4.5.6.3 (1. prijs)
- Quality — zie tenderdocument § 4.5.6.3 (2. technische waarde)
- Quality — zie tenderdocument § 4.5.6.3 (3. lead time)
Official publications
- TED · 00383954-2025 · 13 June 2025
- OJS · 112/2025 · 13 June 2025
Other tenders from SCK CEN
- Accord-cadre pour la nomination de bureaux intérimaires - mini-concours
- Achat, fourniture et installation de systèmes de chromatographie liquide haute performance (HPLC)
- Delivery of Vacuum pumps & measurement tools
- Framework Agreement Timing Network Devices for MYRRHA Phase I (MINERVA) 100 MeV proton LINAC
- Framework agreement: integration and test partner - electrical technician
- Support temporaire par des externes dans des domaines IT
- Support temporaraire par des externes dans des domaines OT
- Framework Agreement Timing Network Devices for MYRRHA Phase I (MINERVA) 100 MeV proton LINAC
- The construction of the conventional SCK CEN MINERVA accelerator buildings (ACC) and MINERVA Applications Centre (MAC)
- The construction of the conventional SCK CEN MINERVA accelerator buildings (ACC) and MINERVA Applications Centre (MAC)
Frequently asked questions
- What is the deadline to bid for this tender?
- The submission deadline is 18 July 2025, 12:00. Check the official source, as dates can be modified.
- Who is the buyer of this tender?
- The contracting authority is SCK CEN (European Union).
- How can I bid for public tenders in European Union?
- Bids are submitted through the official procurement portal of European Union. El Vínculo helps you find tenders and analyse their documents; submission always happens at the official source.
Get alerts for tenders like this
Create a free account and receive new tenders from European Union matching your business, every day.
Create a free account and receive new tenders from European Union matching your business, every day.