Construction Programme Analyst for proposed 14 storey Office Building at Bank Place, Opera Square, Limerick
Closed. Submission deadline: 28 May 2026.
Interested in tenders like this? Get the next tenders like this one published in the European Union by email. Free, no card needed.
Amounts and figures
€0
Estimated value
1
Lots
Description
Construction Programme Analyst for proposed 14 storey Office Building at Bank Place, Opera Square, Limerick
Official publications
| Medium | Reference | Date |
|---|---|---|
| TED | 00304125-2026 | 4 May 2026 |
| OJS | 85/2026 | 4 May 2026 |
Other tenders from Office of Public Works (OPW)
See the buyer →- Construction Programme Analyst for proposed 14 storey Office Building at Bank Place, Opera Square, Limerick Published: 16 October 2026
- Conservation Architect consultancy services for The Refurbishment, Fitout and Historic Building Retrofit of Áras Mhic Dhiarmada/Busáras,… Published: 16 October 2026
- Façade and Building Envelope Engineering Consultancy Services for The Refurbishment, Fitout and Historic Building Retrofit of Áras Mhic… Published: 16 October 2026
- Geogrid and Geotextile Materials for Constructing Access Haul Roads and Flood Defence Earthen Embankments for the Office of Public Works,… Published: 13 October 2026
- Procurement of Works Contractor (Including PSCS) for Conservation and Adaptation of 14-17 Moore St, Dublin 1 and provision of New Visitor… Published: 12 October 2026
- Department of Defence Head Office, Station Road, Newbridge, B8492 230001 Published: 7 October 2026
- BIM Consultancy Services for the Aquatic House Complex, National Botanic Gardens, Glasnevin, Dublin 9 Published: 5 October 2026
- Civil and Structural, and Building Envelope and Façade Design Professional Consultancy tender for the restoration and redevelopment of the… Published: 5 October 2026
- Project Opera, Bank Place, Limerick City - Provision of Civil and Structural Resident Engineering Services Published: 5 October 2026
- Quantity Surveying Professional Consultancy Services for Aquatic House Complex, National Botanic Gardens, Glasnevin, Dublin 9 Published: 5 October 2026
Previous and next from Office of Public Works (OPW)
- No. 6 Harcourt Street - Conradh na Gaeilge - Phase 3B - Construction of extension shell and core
- Conservation Architect consultancy services for The Refurbishment, Fitout and Historic Building Retrofit of Áras Mhic Dhiarmada/Busáras,…
- Athlone Flood Alleviation Scheme - Deerpark - Bastion Quay Cladding
- Supply and delivery of 56kW (75H.P) 4-WD Tractor
- Consultancy Services for a Feasibility Study on Plant and Systems Focussed Decarbonisation Solutions including Geothermal Study at Garda…
- Consultancy Services for a Feasibility Study on Plant and Systems Focussed Decarbonisation Solutions including Geothermal Study at Garda…
Similar open tenders
- Procurement for an Integrated Design Team to deliver a 5 bedroom Community Dwelling at Milepost, Slieverue, C…
- The Supply and Delivery of Electrical Building Maintenance and Reporting Services for HSE Dublin Mid Leinster…
- Request for Tenders for the provision of Property Valuation Services and Associated Services for The Alzheime…
- The Fort Museum and Event Centre, Cultural Quarter, Portlaoise, Co. Laois.
- Analysis of samples to establish the presence of nematode pests
- Call for Consultancy Services for CAT 1 Life Safety Systems at Scoil Treasa Ballycullen Avenue Firhouse Dubli…
Frequently asked questions
- What is the deadline to bid for this tender?
- The submission deadline is 28 May 2026, 15:00. Check the official source, as dates can be modified.
- What is the estimated value of this tender?
- The estimated value published by the buyer is €0.
- Who is the buyer of this tender?
- The contracting authority is Office of Public Works (OPW) (European Union).
- How can I bid for public tenders in the European Union?
- Bids are submitted through the official public procurement portal in the European Union. El Vínculo helps you find tenders and analyse their documents; submission always happens at the official source.
How can I find out about similar tenders when they are published?
Create an account at el-vinculo.com and we give you a free month and set up your company's filters — contract type, CPV codes, value and territory — so you are the first to know when new tenders like this one come out in the European Union. We email you as soon as one matching your profile is published, with the whole deadline ahead to prepare the bid.
Get alerts for tenders like this
Create a free account and receive new public tenders published in the European Union that match your business, every day.
Create a free account and receive new public tenders published in the European Union that match your business, every day.