Bakerloo Line Upgrade Stage 1 Infrastructure Works
Reference ocds-h6vhtk-051c29 · Transport for London
Prior notice.
Interested in tenders like this? Get the next tenders like this one published in the United Kingdom by email. Free, no card needed.
Amounts and figures
Description
The Bakerloo Line runs through London from Harrow & Wealdstone, in the North, to Elephant & Castle in the centre with plans to extend South as part of the Bakerloo Line Extension initiative. The Bakerloo line fleet (72 Tube Stock) is now the oldest rolling stock operating in the UK with considerable costs to life-extend the fleet and significant risks to reduction in reliability. TfL therefore intends to introduce the new rolling stock onto the Bakerloo Line. The BLU Stage 1 Infrastructure works are required modify and upgrading the line's infrastructure to enable the introduction of the new rolling stock with the works expected to completed by, circa 2034. The core elements of the scope include: • Reconstructing Stonebridge Park Depot to consolidate all maintenance activities. • Expanding Queen's Park Area to deliver additional stabling capacity. • Modifying London Road Sidings to retain and minimally adapt existing facilities for continued stabling usage, as well as introducing a Driver's Training Facility. • Waysides works to ensure the line's power supply, signalling systems and potentially gauging is compliant with the new rolling stock. This is a refinement of the scope pres…
Official publications
| Medium | Reference | Date |
|---|---|---|
| FTS | 024218-2026 | 17 March 2026 |
Other tenders from Transport for London
See the buyer →- Construction Logistics and Cyclist Safety (CLOCS) Published: 17 November 2026
- London Cable Car Customer Enhancements Published: 17 November 2026
- Engineering Vehicles - Strip and Spray and Bogie Overhaul for General Purpose (GP) Published: 12 November 2026
- Supply and Changeout of the Auxiliary Batteries and Battery Trays - Jubilee Line Fleet Published: 11 November 2026
- Maintenance and Replacement of Compressors and Driers across the London Underground Estate Published: 11 November 2026
- Maintenance, Service and Support of Track Ultrasonic Testing Devices Published: 9 November 2026
- Windrush Line Transmission System and LAN WAN Design and Build Published: 9 November 2026
- Escalator Drive Equipment Published: 9 November 2026
- Media Planning and Buying Published: 6 November 2026
- Architecture and Urbanism Framework 4 Published: 6 November 2026
Previous and next from Transport for London
- Greenwich Bunds Re-Lining Project
- CCTV In-Station System Hardware and Software Maintenance
- Engineering Vehicles - Maintenance & Support Services
- Track Welding and Grinding Services
- Extension to CCTV monitoring services at Westbourne Park
- Woolwich Ferry Power Management System Service Support and Improvement Actions
Similar open tenders
Frequently asked questions
- Who is the buyer of this tender?
- The contracting authority is Transport for London (United Kingdom).
- How can I bid for public tenders in the United Kingdom?
- Bids are submitted through the official public procurement portal in the United Kingdom. El Vínculo helps you find tenders and analyse their documents; submission always happens at the official source.
How can I find out about similar tenders when they are published?
Create an account at el-vinculo.com and we give you a free month and set up your company's filters — contract type, CPV codes, value and territory — so you are the first to know when new tenders like this one come out in the United Kingdom. We email you as soon as one matching your profile is published, with the whole deadline ahead to prepare the bid.
Public tenders by region
Create a free account and receive new public tenders published in the United Kingdom that match your business, every day.