To produce a detailed Conservation Assessment and Method Statement (PSDP) for the upstanding section of the town wall of Drogheda to the east of Featherbed Lane and running between Laurence Street and Bachelor’s Lane. A detailed site-based survey, equivalent to Level 3 of Historic England’s “Understanding Historic Buildings, a Guide to Good Recording Practice”, must be carried out.
Buyer: Louth County Council_381
- Published
- 17 June 2025
- Estimated value
- €45,000
- Lots
- 1
- Notice number
- 00389222-2025
- Official source
- Official source
CPV codes
- 71000000Servicios de arquitectura, construcción, ingeniería e inspección
Description
To produce a detailed Conservation Assessment and Method Statement (PSDP) for the upstanding section of the town wall of Drogheda to the east of Featherbed Lane and running between Laurence Street and Bachelor’s Lane. A detailed site-based survey, equivalent to Level 3 of Historic England’s “Understanding Historic Buildings, a Guide to Good Recording Practice”, must be carried out. Archaeological and ecological surveys will be carried out as part of the project, including mortar sampling and testing, under archaeological monitoring, but there will be no building work in 2025. The study would inform future applications, applications for Ministerial Consent and the drawing up of tender documents for works over the next few years. The surveys would also map, assess, characterise, describe and present the spaces on either side of the town wall, with particular emphasis on the changes in levels of the steeply-falling ground (there is approximately 10m of a height difference between the two streets). These studies would also inform future efforts to open up access to the town wall, on one or both sides, and to designs for new, potentially-tourism-related uses of these spaces (subject to …
Official publications
- TED · 00389222-2025 · 17 June 2025
- OJS · 114/2025 · 17 June 2025
Frequently asked questions
- What is the estimated value of this tender?
- The estimated value published by the buyer is €45,000.
- Who is the buyer of this tender?
- The contracting authority is Louth County Council_381 (European Union).
- How can I bid for public tenders in European Union?
- Bids are submitted through the official procurement portal of European Union. El Vínculo helps you find tenders and analyse their documents; submission always happens at the official source.
Create a free account and receive new tenders from European Union matching your business, every day.