Pumping Chambers for SFRS
Buyer: FAIR - Facility for Antiproton and Ion Research in Europe GmbH
- Published
- 27 March 2025
- Place of performance
- Darmstadt, DE711
- Procedure
- Negotiated procedure
- Lots
- 1
- Documents
- 1
- Notice number
- 00195896-2025
- Reference
- fa016a74-f07d-41fb-a936-b1774a1d9793
- Official source
- Official source
CPV codes
- 31643000Aceleradores de partículas
- 38000000Equipo de laboratorio, óptico y de precisión (excepto gafas)
- 42000000Maquinaria industrial
Description
The pumping chambers serve as the interface for the ion getter pumps and vacuum diagnostic components of the Super-FRS beamline. It shall also be equipped with one or two bellows, three pumping ports, and a vacuum diagnostic port. The DN400CF pumping chambers with integrated hydroformed bellows of the Super-FRS beamline are designed to operate at room temperature under an ultimate pressure below 10^7 mbar. The hydroformed bellows function as flexible and adaptable connections between adjacent vacuum components, ensuring vacuum integrity while accommodating mechanical tolerances and thermal expansion. A total of seven DN400CF pumping chambers and their support frames are required as part of this.
Award criteria
- Price — Preiskriterium für "Preis-Quotient-Methode"
- Quality — Logical and comprehensible presentation of the design concept. Detailed description of production and manufacturing processes, including technical equipment. Detailed procedure ensuring compliance…
- Quality — Detailed description of all necessary production and manufacturing processes, including technical equipment. Clear demonstration of how specifications are met, covering manufacturing, assembly, and…
- Quality — Precise explanation of the QA approach and its involvement in all manufacturing and acceptance tests. Evaluation of how QA is integrated into visual, mechanical, and vacuum and relative magentic…
- Quality — Clear commitment to meeting the agreed delivery schedule with realistic planning. Well-defined project timeline, milestones, and checkpoints to track progress. Assessment of readiness regarding…
Official publications
- TED · 00195896-2025 · 27 March 2025
- OJS · 61/2025 · 27 March 2025
Other tenders from FAIR - Facility for Antiproton and Ion Research in Europe GmbH
- Switchable Beam Dump
- Reach Truck (Electrical)
- HEBT Modular Stands B4.FS2
- SIS100 Anti-Cryostat-2
- Concrete Beams for the CBM Experiment
- SFRS Beam Cacher 1+2 inner shielding
- Accelerator Control System Engineering Support
- FAIR External consulting services provided by a magnet expert
- Cryogenic Production Supervision
- Gate Valve Inflatable Bellow Structure for SFRS
Frequently asked questions
- Who is the buyer of this tender?
- The contracting authority is FAIR - Facility for Antiproton and Ion Research in Europe GmbH (European Union).
- How can I bid for public tenders in European Union?
- Bids are submitted through the official procurement portal of European Union. El Vínculo helps you find tenders and analyse their documents; submission always happens at the official source.
Create a free account and receive new tenders from European Union matching your business, every day.