Precipitation gauges and 3rd line maintenance
Buyer: Ministerie van Infrastructuur en Waterstaat
- Published
- 10 July 2024
- Submission deadline
- 14 August 2024, 11:00
- Procedure
- Open procedure
- Lots
- 1
- Documents
- 1
- Notice number
- 00411724-2024
- Reference
- c2dc50fd-0be4-45af-bbcd-36e2eaee41cb
- Official source
- Official source
CPV codes
- 38430000Aparatos de detección y análisis
- 38300000Instrumentos de medición
Description
The Contract involves the delivery of Precipitation gauges and third line maintenance on behalf of the Royal Netherlands Meteorological Institute (KNMI) as the Contracting Authority. The motivation behind this project is based on the need to replace the existing KNMI designed Precipitation gauges that have been used in KNMI’s automated network of Precipitation gauges since 1992. The scope of this European tender is to purchase a catchment style Precipitation gauge that adheres to WMO specifications for precipitation accumulation, intensity, and duration. If Supplier can not offer a catchment style gauge that can report duration with the required accuracy, then Supplier can include an additional precipitation monitor/detector in its offer to operate in parallel with the gauge. The expected order value of the purchase of the offered Solution is 50 gauges. The expected order value of the purchase of the offered Solution is 50* gauges x € 2.700 to € 6.000 per Solution = € 135.000 to € 300.000,-. The estimated value of 3rd line maintenance over the total technical life of the Solution is estimated to be about 20% of the purchase value: 20% from € 135.000 to € 300.000,- = € 27.000,- …
Award criteria
- Price — Price award criterion
- Quality — Quality award criterion
Official publications
- TED · 00411724-2024 · 10 July 2024
- OJS · 133/2024 · 10 July 2024
Other tenders from Ministerie van Infrastructuur en Waterstaat
- Signaleringsysteem emitterende tankschepen
- Raamovereenkomst dienstverlening ITS, Smart City & Smart Mobility
- Seismological Instruments Lot 1 Surface Accelerometer en Lot 2 Dataloggers
- Rijksbrede Europese Aanbesteding Inkoop(advies)diensten en Contract- en leveranciersmanagement 2027 - 2031
- Wijziging art. 2.163d AW Nadere Overeenkomst onder de Raamovereenkomst 'Beleidsadvies- en Ingenieursdiensten 3' NOK MIRT verkenning A2/N2
- Vrijwillige transparantie VESDI
- Strategische intermediair diensten toekomstbestendige Mobiliteit en Logistiek
- Marktconsultatie Waarderingen en waardebonnen
- Notuleerdiensten
- Onderhandse gunning aankoop regeringsvliegtuig
Frequently asked questions
- What is the deadline to bid for this tender?
- The submission deadline is 14 August 2024, 11:00. Check the official source, as dates can be modified.
- Who is the buyer of this tender?
- The contracting authority is Ministerie van Infrastructuur en Waterstaat (European Union).
- How can I bid for public tenders in European Union?
- Bids are submitted through the official procurement portal of European Union. El Vínculo helps you find tenders and analyse their documents; submission always happens at the official source.
Create a free account and receive new tenders from European Union matching your business, every day.