Overhead transmission line conductors 2024-2028
Buyer: Fingrid Oyj
- Published
- 23 August 2024
- Procedure
- Negotiated procedure
- Lots
- 1
- Notice number
- 00505936-2024
- Reference
- eb523382-9ae7-4ff6-82e8-b4693fa31a8a
- Official source
- Official source
CPV codes
- 31321100Líneas aéreas de energía
Description
Fingrid Oyj, the Finnish national power transmission system operator, is planning to build several new overhead transmission lines (OHTL) during 2024...2028. The construction of new lines is part of large investment program to reinforce the grid and make fossil-free transition of electricity system possible in Finland. The lines will be designed and built for voltage levels 400 kV and 110 kV. The construction of OHTLs, including stringing of conductors, will be performed as turnkey contracts by specialized transmission line construction contractors employed separately by Fingrid. However, outside of these contracts is delivery of conductors, which Fingrid will procure by himself. The total amount of conductors needed during 2024...2028 is about 30 000 metric tons. Fingrid has standardized conductors: ACSR Finch 565/72 for 400 kV lines and ACSR Duck 305/39 for 110 kV lines. In addition AACSR Sustrong 106/25 is used as earth wire for both 110 kV and 400 kV lines. Standardized drum lenghts will be used: 3000 m for Finch, 4500 m for Duck and Sustrong. Fingrid plans to divide the deliveries to 2 to 4 manufacturers. With this invitation to participate in prequalification Fingrid Oyj i…
Awards
| Awarded to | Amount | Date |
|---|---|---|
| Apar Industries limited | — | — |
| Jiangsu Zhongtian Technology Co. | — | — |
| Midal Cables Limited | — | — |
| Sterlite Power Transmission Limited | — | — |
| NPA Skawina Sp | — | — |
| Prysmian Group Finland Oy | — | — |
| TRATOS SRL | — | — |
Official publications
- TED · 00505936-2024 · 23 August 2024
- OJS · 164/2024 · 23 August 2024
Other tenders from Fingrid Oyj
- ÅB01 Åbackan 400 kV ja 110 kV sähköaseman maanrakennustyöt
- Anttilan 400kV sähköaseman laajennus
- The construction of 400 kV transmissionline Herva - Nuojuankangas
- The construction of 400 kV line Ullava-Alajärvi
- LK01 Lähteenkylän 400kV sähköaseman maanrakennustyöt, 1. vaihe
- West Coast Synchronous Compensator Stations 2 and 3
- Procurement of Operational Control and Support System for the Transmission Grid
- Hikiän 400 kV kytkinlaitoksen laajennus (HI10)
- Procurement of high-pressure liquid fuel metering systems for Pratt & Whitney JT4A-11 and GG4C1-D gas generators
- Voimajohtojen yleissuunnittelu, hyväksyntä 2026
Frequently asked questions
- Who is the buyer of this tender?
- The contracting authority is Fingrid Oyj (European Union).
- How can I bid for public tenders in European Union?
- Bids are submitted through the official procurement portal of European Union. El Vínculo helps you find tenders and analyse their documents; submission always happens at the official source.
Create a free account and receive new tenders from European Union matching your business, every day.