Global Tech I Offshore Wind GmbH - SMA WTG
Buyer: Global Tech I Offshore Wind GmbH
- Published
- 24 January 2024
- Submission deadline
- 28 February 2024
- Place of performance
- DE600
- Procedure
- neg-w-call
- Lots
- 3
- Notice number
- 00047633-2024
- Reference
- 43c41901-4e53-433c-9cd9-9c7024db6e1d
- Official source
- Official source
CPV codes
- 76521000Servicios de instalaciones en alta mar
- 76520000Servicios prestados en alta mar
Description
Global Tech I is a 400 MW wind farm in the German Exclusive Economic Zone (EEZ) of the North Sea, located about 110 kilometres from the shore, operated by Global Tech I Offshore Wind GmbH (GTI). The offshore wind farm (OWF) has been operational since 2015 and is subjected to a Feed-In Tariff (FiT) regulated under the German EEG (German: Erneuerbare-Energien-Gesetz) regime. Global Tech I is entitled to a fixed electricity price of EUR154/MWh until 2026/2027. After this period, Global Tech I is supported by a floor price of EUR39/MWh until the end of 2036/2037. Global Tech I comprises 80 wind turbine generators (WTGs) type AD 5-116 with a 5,2 MW nominal power manufactured by Adwen (now rebranded to Siemens Gamesa Renewable Energy Deutschland GmbH (SGRE DE)). The wind turbines are mounted on steel tripod foundations, and the rotor diameter is 116 meters. Global Tech I connects to the grid via TenneT"s BorWin Gamma HVDC platform, where TenneT is obliged to take off all electricity generated under the EEG. The Balance of Plant operation and maintenance (BoP O&M) scope is performed and managed by GTI, including a single offshore substation (OSS) operated by GTI. An operational control c…
Frequently asked questions
- What is the deadline to bid for this tender?
- The submission deadline is 28 February 2024. Check the official source, as dates can be modified.
- Who is the buyer of this tender?
- The contracting authority is Global Tech I Offshore Wind GmbH (European Union).
Create a free account and receive new tenders from European Union matching your business, every day.