FAIR SFRS Plastic Scintillators
Buyer: FAIR - Facility for Antiproton and Ion Research in Europe GmbH
- Published
- 17 July 2025
- Submission deadline
- 18 August 2025, 12:00
- Place of performance
- Darmstadt, DE711
- Procedure
- Open procedure
- Lots
- 1
- Documents
- 1
- Notice number
- 00466905-2025
- Reference
- 53e00530-2c9b-4830-ac43-8334576348bf
- Official source
- Official source
CPV codes
- 31643000Aceleradores de partículas
Description
The Plastic Scintillators detectors are part of the timing system of the Super-FRS. They will be used to provide the timing signals of the travelling ion beams. Being fast enough to allow for triggering, they will be used for performing in-beam (time) calibration of other Super-FRS detectors. Additionally, FMF2 and FHF1 systems will be used to provide measurements of the velocity of the ion/fragment beams on event-by-event basis, similarly as the ToF (Time of Flight) detectors. The Beam Diagnostic component Plastic Scintillators of the Super-FRS consists of 6 detector units and 1 spare unit. They are listed in Table 1. Their location along the Super-FRS is shown in Figure 1. Operating in vacuum (pressure p ? 1*10e-7 mbar) as start detectors at the stations (or focal planes) FPF2, FPF4 of the PS and FMF1, FMF2, FMF3, FHF1 of the MS, they provide the timing signals needed for triggering and calibrations, contributing to the identification of the slow-extracted Super-FRS ion beams. Each detector (drive) inside the Super-FRS vacuum chamber is vertically movable along the transversal beam cross section. The movement is conducted by pneumatic actuator on an installation flange. All det…
Official publications
- TED · 00466905-2025 · 17 July 2025
- OJS · 135/2025 · 17 July 2025
Other tenders from FAIR - Facility for Antiproton and Ion Research in Europe GmbH
- Switchable Beam Dump
- Reach Truck (Electrical)
- HEBT Modular Stands B4.FS2
- SIS100 Anti-Cryostat-2
- Concrete Beams for the CBM Experiment
- SFRS Beam Cacher 1+2 inner shielding
- Accelerator Control System Engineering Support
- FAIR External consulting services provided by a magnet expert
- Cryogenic Production Supervision
- Gate Valve Inflatable Bellow Structure for SFRS
Frequently asked questions
- What is the deadline to bid for this tender?
- The submission deadline is 18 August 2025, 12:00. Check the official source, as dates can be modified.
- Who is the buyer of this tender?
- The contracting authority is FAIR - Facility for Antiproton and Ion Research in Europe GmbH (European Union).
- How can I bid for public tenders in European Union?
- Bids are submitted through the official procurement portal of European Union. El Vínculo helps you find tenders and analyse their documents; submission always happens at the official source.
Create a free account and receive new tenders from European Union matching your business, every day.